K11 waterproof coating is used in polymer synthesis of two-component waterproof coating, using imported raw materials, unique formula design, the liquid mixed with powder to produce chemical reaction, the strength of the formation to form a layer of jointless high elastic waterproof membrane, high adhesion of coating and substrate, can be used for long-term immersion environment, at the same time also has a certain flexibility, can resist mild concussion and tiny displacement at the grass-roots level. Blue upgrade plugging effect is better, more assured waterproof.
features
1, construction is convenient, can be directly in the wet ground construction.
2. Excellent tensile performance, able to resist shrinkage and cracking and slight vibration caused by temperature difference of base surface.
3. Good bonding performance. The coating penetrates into the substrate to achieve full adhesion without empty drum and water channeling, and can seal the loose substrate, special-shaped parts, pre-cast joints and basal surface cracks.
4, durability: with synthetic polymer excellent weather resistance, can be durable waterproof.
5, environmental protection: non-toxic and harmless, no smell, is the national key recommendation of green waterproof materials.
6, formula upgrade, blue classic latest formula, waterproof effect is better.
scope of application
Especially suitable for kitchen, toilet, pool, exterior wall and other indoor and outdoor waterproof works, also can be used for basement, underground garage, bomb shelter, underground tunnel, subway culvert waterproof
technical indicators
The implementation of the national standard GB/ t23445-2009 "polymer cement waterproof coating" standards.
Solid content 70%; Fracture elongation 200%; Adhesive strength 0.50mpa
use method
1. Base surface treatment
Clean and level the base surface to keep no cracks or looseness; Angle of Yin and Yang made into arc Angle; Smooth out sharp points.
2. Node location processing
Wet the base surface with water, strengthen the yin-yang corner, pipe through wall, floor drain and construction joint with flexible waterproof coating and glass fiber cloth, with a thickness of about 1.0mm.
3, waterproof coating brush
Wet the base surface, maintain a certain humidity but no water, will be in proportion to stir the waterproof coating directly brush on the base surface, pressure brush several times; After the first layer is not sticky, directly brush the second layer (each layer is about 0.6mm, cannot be too thick); General waterproof need to brush more than two layers, the last time in the waterproof layer is not dry in the above scattered sand, can enhance its adhesion with the protective layer. Brush the edge of the coating several times after the head; Wait until the waterproof layer is completely dry and solid.
4, waterproof protective layer
After the waterproof layer is dry and solid, 1.5-50px thick cement mortar protective layer can be made according to the demand.
5. Powder: liquid =3.5:1.5
6. Reference quantity: thickness 1.0mm, about 1.8-2.0kg /m2; Thickness 1.5mm, about 2.5-2.7kg /m2. This dosage is for reference only. The actual dosage may vary slightly due to different operating conditions and base plane.
k11 blue classic waterproof coating notes
1. After the coating is mixed evenly, it should be used up in one time.
2, the construction temperature is suitable for 5 ~ 45 degrees Celsius, ensure air circulation during the construction.
3, within two days after the construction, pay attention to rain, strong sun or cold; Wash tools and equipment with water immediately after use.
packaged and stored
5kg, 10kg, 20kg drum, with a shelf life of 24 months.
In addition, customers can adjust different colors, such as green, black, red, etc.